Planning Support

We take care of the planning side of your project, from working out what permission you need to preparing and submitting the drawings, so your building gets the green light without the guesswork.

  • 180+

    Structures installed in the UK

  • 40+

    Years of industry experience

  • Accreditations

    5

    Industry accreditations

  • Storage Building

    10–50m

    Sizes we design and build

Planning, handled for you

Planning can be the part of a project that slows everything down. Different structures need different permissions, every local authority works a little differently, and getting the paperwork wrong costs weeks.

We have spent 40 years getting storage buildings approved across the UK, for councils, highway authorities and commercial operators. We advise you on what your structure needs, prepare the drawings and documents, and deal with the planning authority for you.

We tell you what your structure needs

Not every building needs full planning permission. Some qualify as permitted development, some can go up as temporary structures, and others need a full application. The right route depends on the type of building, its size, where it sits and your local authority's rules.

We look at your site and your structure, then tell you straight what is involved before you commit. No surprises later in the project. We check:

  • Whether your building is permitted development or needs a full application

  • Site factors like access, drainage, neighbours and ground conditions

  • Your local authority's policies and local plan

  • Building regulations and structural sign-off

We prepare and submit everything

Once we know the route, our team puts together the drawings, structural information and supporting documents your application needs, all to the standard planners and building control expect. We submit the application and handle the back and forth with the planning authority, so you are not left chasing it.

Because we design and engineer every structure in-house, what you submit matches the building we actually build.

Designs that get approved

Forty years working with councils and highway authorities means we know what planners look for. Where a site is sensitive, we adapt the design to suit, whether that is a low-impact colour, timber cladding to soften the look or a shape that fits an awkward plot.

At Cannop in the Forest of Dean, we clad a dome in timber at the planners' request so it blended into the woodland around it. Small changes like these can be the difference between a smooth approval and a drawn-out one.

How we help with planning

Planning does not have to be the part of the project that holds everything up. We guide you through it one clear stage at a time, from the first look at your site to the day the decision lands, and we keep you updated at every step so you always know where your application stands and what happens next.

Planning support for every structure

Whatever you are planning, we can guide it through.

Container Canopies

Often relocatable and treated as temporary structures, which can simplify the process or remove the need for permission altogether. We confirm the position for your site.

Find out more >

Dome Timber Barns

Larger, permanent stores that usually need a full planning application. We handle the whole process for you, from the first drawings through to the final decision.

Find out more >

Fabric Buildings

Frequently permitted development, though it depends on the size and the site. We check the rules that apply to your project and confirm the position before you commit.

Find out more >

Sliding Roofs

A low-profile addition that often sits within permitted development. We advise on what applies to your existing setup and handle any application that you need.

Find out more >

Our latest projects

Throughout the UK and Ireland, we've installed over 180 storage buildings, many on sites where planning needed careful handling.

Cannop, for Gloucestershire County Council

An operational salt store in the Forest of Dean. At the planners' request, the dome's concrete wall was clad in timber so the 4,000 tonne building sat comfortably in its woodland setting.

Watch and see the results for yourself.

Let’s talk about your planning

Speak to one of our experts about your project. Tell us about your site and what you want to build, and we'll advise on the planning route and handle the application for you. Call, email or fill out the form and we'll be straight back to you.

Lucas Hooijenga, Managing Director
lucas@eurodome.com | 07500 66 44 22

Cameron Dickson, Commercial Director cameron@eurodome.com | 07868 20 88 47